Channeled scablands: Othello to The Dalles

Steven Dutch, Professor Emeritus, Natural and Applied Sciences, University of Wisconsin - Green Bay


Acknowledgement

I need to make it crystal clear that none of this is my ownresearch. The pictures on this and associated pages were taken ona GSA field trip in 1994 led by Richard B. Waitt of the U.S.Geological Survey, and the interpretations presented here arelargely those of Dr. Waitt as presented on the field trip and itsguidebook. I thank Dr. Waitt and his colleagues for a stupendousfield experience.

4.1 Washtucna Coulee

Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
Channeled scablands Channeled scablands

4.2 Sculpted Loess "Prows" on Palouse-Snake Divide

Channeled scablands Channeled scablands

4.3 Palouse Falls

Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
Channeled scablands  
Channeled scablands Channeled scablands
Channeled scablands Channeled scablands

4.4 Palouse-Snake Confluence

Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
Channeled scablands  

4.5 Shoulder Bar

Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
Channeled scablands  

4.6 Proximal Rhythmites

Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
   

4.7 Backflood Rhythmites

Channeled scablands Channeled scablands
Channeled scablands Channeled scablands
Channeled scablands  

Loess Landscapes Near Walla Walla

Channeled scablands Channeled scablands

Pasco Basin and Blue Mountains

Channeled scablands Channeled scablands
Channeled scablands  

4.8 Burlingame Canyon

Channeled scablands This is what started it all. This irrigation ditch got out of control and carved the ravine below, exposing dozens of backflood deposits.
Channeled scablands Channeled scablands
Channeled scablands  
Channeled scablands Closeup of finely laminated sediments
Channeled scablands 13,000 Ka ash layer from Mount St. Helens. The presence of a well-defined ash layer argues strongly for subaerial conditions between rhythmite layers.
Channeled scablands Left and below: sunset on the Blue Mountains.
Channeled scablands Channeled scablands

Wallula Gap

What caused the backflooding at Burlingame Canyon was the constriction at Wallula Gap. The floodwaters could not get through a gap a mile wide.Maximum flood waters reached elevations of about 380 meters. It's fairly simple to estimate flow through a constriction, but the picture is complicated by flooding of the gorge further downstream. When that complication is taken into account, the peak flow is estimated to have been about 10 million cubic meters per second (the volume of Grand Coulee Dam every second). With a channel 2000 meters wide and water 250 meters deep, that translates to a velocity of 20 meters per second or 45 miles an hour. 10 million cubic meters per second is about 50 times the flow of the Amazon River and 300 times as big as the largest historic flood along the Columbia River.


Overview
Spokane to Soap Lake
Soap Lake to Chelan
Chelan to Othello
The Dalles to Seattle

Return to VirtualField Trips Index
Return to Professor Dutch's Home Page

Created 7 April 2003, Last Update 11 January 2020